Vibiemme Domobar Double version 3 príručka

(1)
  • Courtesy of:
    Vibiemme Double Boiler Supplemental Instructions
    Turning on and priming:
    1. If reservoir model, rinse and fill the reservoir. If plumbed in version, connect and open
    water supply (water softener and water pressure regulators requirements are covered
    separately)
    2. Plug the machine in and turn the switch to position “I” (one). The Power light on far right
    will come on. NOTE: Setting the rotary switch to position “I” will activate all the
    functions of the machine such as the autofill circuit, power to the PID, power to the
    pump, solenoid valve, microswitch for the lever and power the brew boiler heating
    element (but not the steam boiler heating element). The machine should arrive with the
    PID turned off and it is very important for the PID to remain OFF until both of the boilers
    are primed. When the PID is OFF, there is no power supplied to the brew boiler heating
    element.
    Upon turning the switch to position “I” the display will turn on and show the software
    version (ex. 1.00). Then after few seconds, the word OFF will appear. If OFF is not
    displayed and you see a temperature reading instead, immediately push and hold the right
    side button on the PID to turn it off.
    3. Within a few seconds the autofill should turn on (you will hear the pump) and the steam
    boiler will fill until the proper level is reached. For reservoir models keep an eye on the
    water reservoir and make sure that the water level is going down.
    4. It is possible that the steam valve and hot water spout have been opened for shipping,
    especially in the winter months to avoid freezing issues. If they are open, now is a good
    time to close them. However, if they arrived closed, now is a good time to open them to
    release negative/cold air that may have accumulated in the boiler.
    5. After the steam boiler’s autofill is completed, engage the grouphead lever (pump will
    start again). Allow a few ounces of water to flow out the group, and then turn the lever
    down (off).
    Now both of the boilers of your machine are primed.
    6. At this point, turn the PID ON by pushing and holding the right button. The word OFF
    will disappear and the PID will start reading brew boiler temperature. For the US market,
    the default temperature reading is in degrees F. If you prefer degrees C it can easily be
    changed with the instructions we will cover further along.
    7. The steam boiler can now be turned on by turning the switch to position II (the left light
    will come on indicating that power is passing through the pressurestat and reaching the
    heating element).
    v.7/09
    1

Máte otázku týkajúcu sa Vibiemme Domobar Double version 3?

Počet otázok: 0

Tu sa jednoducho opýtajte na otázku, ktorú máte ohľadom Vibiemme Domobar Double version 3 od ostatných vlastníkov produktov. Poskytnite jasný a komplexný popis problému a vašej otázky. Čím bude lepšie opísaný váš problém a otázka, tým ľahšie bude pre ostatných Vibiemme Domobar Double version 3 vlastníkov, poskytnúť vám správnu odpoveď.

Tu si zobrazte bezplatne Vibiemme Domobar Double version 3 príručku. Už ste si prečítaly príručku, ale nezodpovedala vám vašu otázku? Položte svoju otázku na tejto stránke ostatným Vibiemme Domobar Double version 3 vlastníkom. Tu položte otázku